Keep numbered trees aligned when a tree-work quote changes

A customer replies that they want two trees removed from the proposal and another one added. Use the assessor’s stable tree references to keep the revised quote and crew brief aligned.

Steps

  1. Establish a common tree reference Use the reviewed site planRecord the customer’s requested changes

    Have the qualified assessor define the tree identifiers used in the proposal. Keep the original plan dated.

    Ask the customer to refer to those identifiers when requesting additions or removals from scope.

  2. Find the current opportunity Select its deal pipelineRead the plan attached to the quote

    Use Pipedrive’s selector to locate the active tree proposal and assigned owner. Confirm which plan issue the current quote uses.

    Keep obsolete attachments identified so another employee does not answer from an earlier tree list.

    Pipedrive demo deal cards with the pipeline selector expanded
    Pipedrive’s sample deal board shows the pipeline selector. Open the pipeline that contains the original proposal. Source
  3. Have the assessor verify the revision List every changed identifierConfirm the new scope in writing

    Send the requested changes to the assessor and ask what needs another site check. Preserve uncertainty rather than guessing a tree from a close-up photo.

    Issue the reviewed proposal with the corresponding plan through your standard approval process.

  4. Check production’s tree list Use the accepted plan versionRecord scope-reference mistakes

    Confirm the crew receives the accepted identifiers and current scope. Keep later changes under the same controlled process.

    Track clarification caused by unstable references and improve the first site-plan handoff.

What to measure

The customer, estimator and crew should use the same accepted tree references.

PipelineOn

Enter your work email to get started

Already have an account? Sign in