Refresh a flooring quote when the homeowner's move date changes

A changed move date can alter access and material choices in an old flooring quote. Find the original proposal before offering another installation window. Ask what changed and let the estimator review the scope.

Steps

  1. Find the paused proposal and current owner Verify property and roomsCheck the original timing and selection

    Open the Pipedrive deal and inspect the proposal, product choice, history and outstanding activities. The shared screenshot shows pipeline selection.

    Confirm whether the customer's reply concerns the same property and rooms. Preserve a separate project when the move involves another address.

    Pipedrive demo deal cards with the pipeline selector expanded
    Pipedrive’s sample deal board shows the pipeline selector. Open the pipeline that contains the original proposal. Source
  2. Ask for the current plans through the site Collect changed timing and occupancyKeep the old proposal available

    Send a short project-update page asking about move timing, access, material and scope changes. Let the customer explain uncertainty.

    Preserve the original quote and date. A returning page visit does not confirm a new move date or acceptance of the previous price.

  3. Recheck supply and installation readiness Verify current product availabilityReview site and preparation assumptions

    Have the estimator and installer review changes and determine whether a fresh measure is needed. Confirm the selected material with the customer.

    Check actual delivery and crew availability before offering dates. Record any product-specific preparation requirements and unresolved access issues.

  4. Record the revised decision on the existing deal Save accepted scope and timingTrack delays and completed installation

    Give one owner the update and next action. Obtain approval for revised scope and terms through your normal process.

    Track replies, completed rechecks, revised proposals and completed jobs. Record unresolved material choices and move-related delays separately from unqualified leads.

What to measure

Use the homeowner's current answer to restart the project. Keep old and revised assumptions distinguishable for the estimator and crew.