Keep an interior designer's flooring selections attached to the estimate
A design referral can arrive before the flooring material is final. Give your office the current selection and who can approve it. Your installer needs the same version that the estimator prices.
Steps
-
Confirm the introduction and decision roles Record the actual designer referralSeparate selection approval and payment
Ask who is hiring, approving material and arranging access. Confirm the service property and the homeowner's permission for necessary coordination.
Mark the design selection tentative or approved as appropriate. A referral or mood board does not establish a purchase order or installation specification.
-
Carry a source label into the site request Collect room and product referencesKeep personal details out of URLs
Ask for rooms, product identifiers if known, current design reference and desired timing. Offer an approved document-sharing route.
Tally supports hidden source labels. The shared screenshot shows that mechanism. Test the actual referral form and verify the office receives the source alongside the current selection.
Tally’s public documentation shows how to carry a campaign label into a submitted form. Source -
Have the installer review the current product Check manufacturer documents and site needsKeep superseded selections visible
Verify the actual model and applicable installation instructions. Let qualified staff determine measurement, site preparation and compatibility requirements.
When the designer or customer changes the selection, preserve the old version and record which proposal uses the new one. Confirm who approves resulting changes.
-
Reconcile the referral through installed work Verify current specification before orderingTrack revisions and completed jobs
Have the owner confirm the approved selection, supplier availability and site readiness before ordering or offering a final date.
Track referred requests, attended measures, specification-ready proposals and installed work. Review delays caused by unclear models or approvals and improve the partner handoff.
What to measure
Test a selection change on a controlled project. The designer, estimator and installer should be able to identify the same current specification.