Set fence Search limits from posts, gates and terrain labor

A fence quote's revenue can hide different gate, terrain and preparation costs. Build campaign economics from actual completed work. Keep unknown or unserviceable inquiries in the cohort so the calculation reflects the business.

Steps

  1. Define the inquiry and project cohort Use one campaign and intake periodRecord assessed scope categories

    Track unique properties through qualification, attended estimates, accepted proposals and completed paid work. Preserve unresolved projects.

    Keep gate count, material and assessed terrain effort with each job. Initial approximate length alone cannot establish contribution.

  2. Use actual campaign cost and source evidence Export spend and clicksVerify call and project connections

    Google defines average CPC as click cost divided by clicks. Save report settings and keep forecast bids separate from actual spend.

    The shared CallRail image is an example. Inspect your actual source record and leave uncertain household joins unresolved.

    CallRail caller timeline showing website session and landing page fields
    CallRail’s example of the visitor session attached to a tracked call. Source
  3. Calculate contribution before advertising Include direct materials and laborAccount for unsuccessful estimates

    Subtract actual posts, gates, materials, labor, equipment, travel and relevant sales effort from collected cohort revenue. Count revenue once.

    Divide pre-ad contribution by unique inquiries for planning. Reserve what you need for overhead and profit before choosing the acquisition ceiling.

  4. Review the limiting stage Show completion counts and costsKeep zero outcomes unresolved

    Report spend per qualified request, attended estimate and completed project. Split scope groups when they materially change the decision.

    Review service coverage, access, material supply and proposal decisions before raising spend. A cheaper click does not establish a profitable fence job.

What to measure

Save campaign exports with job-cost records. Recheck the allowance when product mix, site effort or completed outcomes change.

PipelineOn

Enter your work email to get started

Already have an account? Sign in