Review customer-supplied siding before accepting an installation quote
A homeowner with siding already purchased needs your installer’s acceptance decision before the office promises labor.
Steps
-
Ask what material is available Request the product referenceRecord the requested installed areas
Collect the customer’s stated quantities, product details and any existing plans through the approved route.
Have operations state whether customer-supplied work is considered and what requires inspection before quoting.
-
Keep the source and inventory request together Use a material-review labelTest the received information
Use a Tally request link with a neutral customer-materials source field. Ask which product information the customer can provide.
Submit a test and confirm the installer reviewer receives the reference and scope description.
Tally’s public documentation shows how to carry a campaign label into a submitted form. Source -
Have the installer accept or decline the scope Review actual material informationIdentify missing supply items
The qualified reviewer decides what inspection or supplier confirmation is required. Keep uncertainty about condition or quantities visible.
Tell the customer what your company can quote and who supplies unresolved items before issuing an offer.
-
Track accepted installation scopes Record material-related declinesCheck proposal responsibilities
Verify the accepted proposal lists supply responsibilities your team approved. Preserve the customer material reference.
Review repeated scope changes caused by incomplete product information and improve intake.
What to measure
Offer labor only after the installer has reviewed the material and supply responsibilities.