Keep old kitchen drawings from replacing the agreed plan in your CRM

A homeowner can email a new cabinet drawing while your office still has the signed layout attached to the estimate. Keep both versions and make the current scope unmistakable.

Steps

  1. Decide what identifies a design revision Use property and a project IDGive revisions an approval state

    Record the version, author, date and status. Keep proposed changes separate from the version used for an accepted price.

    Assign one person to check whether a new discussion affects the existing job or a separate scope before creating a record.

  2. Find the live deal before adding a task Open the proper board in your CRMLink changes to the active project

    In Pipedrive, choose the project pipeline and open the right deal. Check the open activities and document links before creating a change-review task.

    Test one property with two design versions and two appointments. The estimator should be able to tell which one to price and when someone approved it.

    Pipedrive demo deal cards with the pipeline selector expanded
    Pipedrive’s sample deal board shows the pipeline selector. Open the pipeline that contains the original proposal. Source
  3. Resolve similar requests against first-party evidence Verify the actual project in the recordRoute ambiguous visits to manual review

    If PipelineOn returns useful site activity for an eligible match, use only verified details to connect it. A view of your remodel page cannot tell you which version someone accepted.

    Keep replies that propose a change attached to the active discussion. Have the project owner review the written scope before follow-up.

  4. Review wrong-version incidents Count repriced and corrected quotesKeep the cause of each error visible

    Audit quotations sent with stale or uncertain reference files. Check whether duplicate contacts or unclear file naming caused each one.

    Fix one source of recurring mistakes and retest a two-version record. Give production the latest approved packet.

What to measure

Give one person a visible next task on every proposed revision, and preserve the accepted plan until approval changes it.

PipelineOn

Enter your work email to get started

Already have an account? Sign in