Prepare a sewer-repair excavation referral for qualified acceptance
A sewer inspection leads to a possible excavation assessment. Your office needs an authorized handoff and a clear boundary between findings and accepted construction work.
Steps
-
Confirm the professional's recommendation Use the actual inspection recordIdentify the requested next assessment
Have the responsible professional state what follow-up is recommended and what remains uncertain.
Do not prescribe excavation from reception notes or tell the customer to begin digging. Keep locating, permits and safe-work planning with the qualified parties.
-
Obtain the customer's handoff choice Identify the repair-scope ownerShare only authorized records
Explain whether your company is offering the next assessment or referring a separate contractor. Let the customer confirm the requested contact.
Use the approved document channel for video or reports and record the authorized recipient. Do not assume a referral transfers approval for construction.
-
Assign the acceptance check Create a linked coordination activityKeep estimate and construction stages distinct
Pipedrive supports activities linked with contacts and deals. Assign a task to confirm that the qualified next party accepts the assessment.
The shared Pipedrive image illustrates pipeline context. Verify the actual property, recipient and due action.
Pipedrive’s sample deal board shows the pipeline selector. Open the pipeline that contains the original proposal. Source -
Close the referral loop Record accepted, declined or awaiting reviewConfirm the customer's next step
Keep ownership visible if the referral is declined or the next contractor needs more information.
Measure referrals without acknowledgement and customer misunderstandings about who is doing the work. Do not count an introduction as completed repair.
What to measure
An accepted assessment handoff is the immediate outcome. Qualified parties determine the construction scope and required coordination.