Keep a credited drain diagnostic fee from inflating acquired-job revenue

A paid inspection leads to a repair and the original fee is credited. Your acquisition report needs the actual collected amount rather than two revenue entries for the same money.

Steps

  1. Define the project accounting view Use one service episode and propertyRecord the actual credit policy

    Work with your bookkeeper to identify which diagnostic and repair invoices belong to the same project.

    Use the terms actually offered to the customer. Preserve standalone diagnostic work separately when no repair follows.

  2. Keep the CRM association explicit Link the repair to the original inspectionStore invoice references without duplicating receipts

    Pipedrive custom fields can store relevant project references, subject to permissions and plan limits. Use controlled references to your accounting records.

    The shared Pipedrive image illustrates pipeline context. It does not prove payment collection or a posted credit.

    Pipedrive demo deal cards with the pipeline selector expanded
    Pipedrive’s sample deal board shows the pipeline selector. Open the pipeline that contains the original proposal. Source
  3. Reconcile actual collected revenue Subtract credits onceInclude the costs of both stages

    Use the accounting ledger to confirm cash collected and the applied credit. Do not add the credited diagnostic amount to the repair receipt again.

    Include direct diagnostic and repair costs under your consistent contribution definition. Keep unpaid invoices and unresolved credits visible for review.

  4. Compare acquisition cohorts honestly Use the original request dateReview completed and standalone work

    Assign campaign acquisition cost to distinct projects using your documented source rules. Allow a consistent period for repairs to complete.

    Measure standalone inspections, repairs completed and collected contribution after acquisition cost. Have the bookkeeper audit a credited example before using the result to increase spend.

What to measure

Use the ledger to settle the number. One credited fee should appear once in the project's collected-revenue story.

PipelineOn

Enter your work email to get started

Already have an account? Sign in