Test whether an extra plumbing quote reminder adds completed jobs

A reply is useful, but completed profitable plumbing work determines whether added follow-up earns its effort. Test one extra reminder against normal handling. Keep customer-requested and urgent operational responses unchanged.

Steps

  1. Define eligible proposals and outcomes Use valid unaccepted scopeExclude active and suppressed cases

    Choose a consistent service type with verified property, owner and proposal. Keep accepted jobs and cases needing immediate service outside the experiment.

    Write normal follow-up, the extra message and an observation window. Define completion and cancellation from actual job records before assignment.

  2. Save randomized project assignments Assign before responses arriveKeep repeat project records together

    Have an analyst randomize eligible projects to normal handling or normal plus the message. Freeze assignments and preserve exclusions.

    NIST describes random assignment in experimental designs. Use the analyst to plan an operational pilot and avoid reassigning failures or promising prospects after sending.

  3. Test the message and existing-quote reply route Verify the actual source and ownerStop after acceptance, decline or opt-out

    Send to a controlled address and inspect the response. If a Tally form is used, preserve a neutral label with hidden fields, as the shared screenshot demonstrates.

    Send the same extra message to its assigned group. Log delivery failures, staff departures and changed scope without removing them from outcome review.

    Tally help page explaining hidden fields and URL parameters
    Tally’s public documentation shows how to carry a campaign label into a submitted form. Source
  4. Compare mature completion and direct effort Use original assignment denominatorsInclude extra visits and staff time

    Report assigned proposals, replies, accepted scope, canceled visits and completed paid jobs. Keep open work visible with equal elapsed time for both groups.

    Review direct project costs and added follow-up effort alongside counts. Ask the analyst to assess uncertainty before claiming incremental revenue or expanding the campaign.

What to measure

Keep assignment and message versions with completed-job records. Use the pilot to decide whether to repeat, revise or stop the extra contact.

PipelineOn

Enter your work email to get started

Already have an account? Sign in