Keep a landscape designer’s lighting referral tied to the approved plan

A lighting referral needs the homeowner’s intended areas and trade responsibilities before the office schedules a consultation.

Steps

  1. Collect the authorized design context Confirm the homeowner’s requestIdentify the current drawing

    Ask which entrances, paths or planted areas the customer wants discussed. Obtain agreement before sharing partner documents.

    Mark whether the supplied drawing is approved or still being revised.

  2. Carry the designer source Use a neutral partner labelTest the referred request

    Give the designer a Tally intake link with a hidden referral code. Keep personal details outside the URL parameters.

    Submit a test and check the office receives the label and drawing status alongside the scope.

    Tally help page explaining hidden fields and URL parameters
    Tally’s public documentation shows how to carry a campaign label into a submitted form. Source
  3. Assign the lighting review Name the project ownerConfirm specialist responsibilities

    Have the project lead decide which qualified trade needs to review the requested electrical work.

    Tell the customer who coordinates the visit and who will price each part. Confirm the plan version with the designer.

  4. Track plan-ready consultations Record missing approvalsSave the quoted lighting boundary

    Separate requests awaiting design changes from scopes ready for review. Assign each missing document.

    Review consultations producing a supported proposal and avoid counting every partner introduction as accepted work.

What to measure

The referral should reach one owner with a current plan and clear trade roles.

PipelineOn

Enter your work email to get started

Already have an account? Sign in