Carry a remodeler's ductwork referral into a coordinated site survey
A remodeler asks whether your HVAC team can handle ductwork changes. The survey needs the project context and a clear contracting contact.
Steps
-
Define the referral roles Identify owner, remodeler and approverRecord the construction stage
Ask who requests the survey, who approves your scope and who coordinates site access. Keep the billing or contracting party explicit.
Record the planned work and existing drawings. Leave system design and suitability to the qualified HVAC reviewer.
-
Label the partner intake Use a neutral referral codeKeep documents out of query strings
Tally hidden fields support carrying a source label in a form URL. Create a remodeler-referral label for the agreed handoff.
The shared Tally image explains hidden fields. Save plans through your approved document process and test that the source survives submission.
Tally’s public documentation shows how to carry a campaign label into a submitted form. Source -
Have the specialist accept a survey Review scope and project timingConfirm attendance and access
Send the brief and available plans to the responsible HVAC professional. Ask which missing facts must be resolved before visiting.
Arrange a survey only after the team accepts the work type and timing. Tell the requester whether you have accepted a site review or committed to a proposal.
-
Check the survey handoff Assign the post-survey actionRecord coordination failures
Keep the survey outcome, questions and proposal owner on the same project record.
Review trips blocked by unfinished access or missing decision-makers. Use those cases to tighten the referral brief with the remodeler.
What to measure
A referral becomes actionable when your specialist accepts the survey and everyone understands the next deliverable.