Set panel-upgrade Search limits from completed project contribution
A panel-upgrade campaign can produce assessment costs before any installation is accepted. Use your actual project cohort to calculate what remains after direct costs. Keep historical bids separate from the campaign spend you actually incurred.
Steps
-
Define the panel-upgrade cohort Use one campaign and inquiry periodTrack surveys and installation outcomes
Identify unique inquiries and follow them through qualification, survey, proposal and completed installation. Include requests your team could not service.
Record actual sales lag and unresolved projects. Keep small electrical repairs and other services distinguishable so their outcomes do not distort upgrade economics.
-
Reconcile actual advertising and source evidence Export spend and clicksKeep unknown source joins unresolved
Google defines average CPC as click cost divided by clicks. Export the actual report settings and campaign spend used for this cohort.
With CallRail, inspect the real timeline and save the call reference. The shared screenshot is an example. Verify the customer and project connection before attributing an installation.
CallRail’s example of the visitor session attached to a tracked call. Source -
Calculate contribution before the advertising allowance Include survey and administration costsAvoid counting deposits as extra revenue
Total collected project revenue once. Subtract direct equipment, labor, subcontract and administrative project costs, including unsuccessful survey effort belonging to the cohort.
Divide pre-ad contribution by unique inquiries for a planning contribution per inquiry. Decide what must remain for overhead and profit before choosing the allowable advertising spend.
-
Review the actual bottleneck before raising spend Compare serviceable inquiries and completed jobsKeep zero and unresolved outcomes visible
Report spend per qualified inquiry, attended survey and completed installation. If no installation has completed, leave that unit cost unresolved rather than inventing a conversion.
Review missed calls, survey capacity, approval dependencies and proposal outcomes. Change the campaign or office process using the stage that actually prevents profitable work.
What to measure
Save campaign exports with the reconciled project-cost cohort. Revisit the ceiling after costs, capacity or conversion outcomes materially change.