Work out what you can pay for a quote-ready concrete lead
A cheap concrete form fill does little for you when it asks for work the crew cannot take. Budget from jobs your team scoped and won, then compare the result with what you actually spent on ads.
Steps
-
Pick one job class to price Separate patios from driveway replacementDefine what makes a request ready to quote
Pull a recent cohort of similar work. Record which requests provided usable access, area and timing information, and whether the requester could authorize the job.
Define the cutoff at which your estimator considered the scope worth pricing. Track smaller jobs that the crew declined separately.
-
Start from real margin and conversion Use contribution before advertisingCount signed jobs from the same cohort
Suppose a completed driveway job contributes $2,000 before advertising and you’re willing to spend $400 of that to win the job. If one in four quote-ready requests signs, your allowable cost is $100 per quote-ready request. Replace both assumptions with your records.
Google Keyword Planner’s bid ranges describe historical top-of-page bids. Use actual campaign spend for your cost calculation and make sure the same job class and dates apply.
-
Separate web friction from scope mismatch Compare page visitors with accepted requestsRead the actual decline reasons
Build a PostHog funnel using your landing page, intake start and accepted request events. Confirm the final event against the requests your office received.
The PostHog documentation image is a sample funnel. Review your own drop-off beside estimator notes. A missed upload and a request for unsuitable work call for different changes.
PostHog’s sample funnel. Substitute your page visit, form open and accepted request. Source -
Allocate spend from verified work Divide spend by quote-ready requestsCheck how many signed and completed
Report matched PipelineOn activity separately from submitted and quote-ready requests. Review eligible website matches for follow-up only after checking fit and open jobs.
Increase spend only after reviewing the number of jobs your crew can still take and the contribution actually recorded for completed work.
What to measure
Use cost per quote-ready request and contribution from completed jobs to decide whether your budget should grow.