Screen commercial asphalt estimates before promising a price

A property manager can request a parking lot price while tenants still need regular access. Your bid needs the traffic plan and scope responsibilities before someone starts pricing.

Steps

  1. Publish the type of commercial work you take Ask for the authorized buyer and siteExplain what a qualified estimate requires

    Describe the surfacing and site types your operation can assess. Keep residential requests on a separate path.

    Ask the requester what needs to remain accessible and who makes closure and approval decisions. Clarify that the estimate timeline depends on a site review.

  2. Keep the site and scope with the right deal Confirm correct board and propertyRecord drawing or site walk version

    If your office uses Pipedrive, start on the relevant project board and inspect the existing deal. Keep the property, scope and contact roles on the right record.

    Verify any documents received via your authorized workflow. Record which party will confirm preparation and drainage assumptions.

    Pipedrive demo deal cards with the pipeline selector expanded
    Pipedrive’s sample deal board shows the pipeline selector. Open the pipeline that contains the original proposal. Source
  3. Send a qualified estimator or authorized partner Confirm what is still uncertainPreserve owner and timeline

    Keep visits and technical judgments with the competent team. If a partner is needed, confirm the customer’s authorized handoff and who owns the reply.

    Eligible PipelineOn page activity may add context to verified project records. Do not infer commercial ownership or bid authority from a site match.

  4. Measure which requests reached bid readiness Track attended site reviews and issued bidsLog scope exceptions

    Record how many received bids, accepted proposals and became completed jobs. Track whether access or unclear prep responsibility delayed pricing.

    Update the intake fields that repeatedly caused site revisits or unclear approvals.

What to measure

A bid should move forward with site access, a qualified owner and written responsibility for the assumptions the estimator still needs to check.

PipelineOn

Enter your work email to get started

Already have an account? Sign in