Test added HVAC quote follow-up against completed installations
A quote that sells after another message was not necessarily won by that message. Assign eligible HVAC proposals before the extra contact and keep both groups on normal service. Compare completed outcomes after the same elapsed time.
Steps
-
Define eligible quotes and one extra message Use current replacement proposalsKeep requested operational responses unchanged
Exclude urgent service, accepted work, active conversations and suppressed contacts. Verify property, owner and valid scope before assigning the pilot.
Write the message, normal follow-up, observation window and completion definition. Include cancellation and changed-equipment outcomes in the review plan.
-
Randomize projects and preserve assignments Assign before viewing repliesKeep duplicate household records together
Have an analyst randomly allocate eligible projects to normal follow-up or normal plus the message. Save fixed assignments and exclusions.
NIST explains randomized designs. Use that principle with the analyst and do not move responders or failures between groups after sending.
-
Test the response path and project owner Verify the real link and reply inboxRecord failures and staff departures
Send a controlled message and inspect the reply task. If using Tally, carry a neutral label through hidden fields, as the shared screenshot demonstrates.
Send only to the assigned eligible group and handle replies normally. Stop messages after acceptance, decline or opt-out. Preserve delivery failures in the outcome data.
Tally’s public documentation shows how to carry a campaign label into a submitted form. Source -
Compare paid completion and practical cost Use all assigned projectsShow counts and unresolved outcomes
Report replies, accepted proposals, canceled jobs and completed paid installations by original group. Use assigned projects as the denominator.
Include message and estimator effort and the same follow-up time. Have the analyst review uncertainty before claiming incremental revenue or expanding the pilot.
What to measure
Keep the exact message and assignment with completed-job records. Decide whether the added work justifies its cost, with small-sample uncertainty visible.