Turn a roofer referral into a correctly sequenced gutter estimate

A roofing partner can refer a gutter project before the roof schedule is settled. Give the referral a clear intake path and verify who is arranging the work. Your office needs the property, requested scope and current roof timeline before promising an installation date.

Steps

  1. Define the partner handoff on your site Explain gutter services and coverageClarify who contracts with the customerAsk before sharing customer information

    Create a referral page covering replacement, repair and any specialty work your crew handles. Explain whether you quote the homeowner directly or work under a separate contractor agreement. Keep that commercial arrangement clear before collecting requests.

    Ask the roofing partner to share the page with the customer or use an approved referral process with the customer's permission. A visit arriving from the link does not establish an authorized referral or a roof project at that property.

  2. Carry the stated referral into the estimate request Ask for service address and requested scopeCollect the referring companyRecord the roof completion status

    Ask the customer for contact details, property address, gutter work needed and the referring company. Include roof work status with planned, underway, completed and unsure options. Let the office confirm the timeline with the authorized parties.

    Tally supports source labels passed through URL parameters into hidden fields. The shared screenshot shows its documentation example. Use that label alongside the customer's stated referral, then test the field in your own submission and CRM handoff.

    Tally help page explaining hidden fields and URL parameters
    Tally’s public documentation shows how to carry a campaign label into a submitted form. Source
  3. Have the estimator confirm sequence and responsibility Review roof and gutter scope togetherVerify the current scheduleAssign one project owner

    Give the estimator the request and any approved partner notes. Have the estimator determine what can be assessed before roof work finishes and what needs a later check. Confirm access, materials and the work each company is responsible for.

    Check the CRM for an existing gutter quote or warranty obligation before creating a new opportunity. Keep one owner responsible for schedule updates. A planned roof date needs confirmation before your office treats it as a committed gutter installation window.

    The roofer’s introduction supplies referral attribution. If PipelineOn shows a verified return to your gutter scope page, share it as context with the existing estimator. Have that person confirm which crew owns the roof edge and when gutter measurements can happen.

  4. Close the referral loop after the job Record accepted and declined referralsTrack attended estimates and installed workShare only authorized status updates

    Record the outcome from request through estimate, proposal, installation and payment. Keep referrals by the same customer at the same property together. Note projects delayed by roof timing or changed scope.

    With the customer's permission, give the partner the relevant scheduling update. Review accepted referrals, sold jobs and return visits caused by sequencing errors. Use that review to improve the information requested on the referral page.

What to measure

Test the handoff with a partner before promoting it broadly. A clear request and verified roof timeline give both offices something they can schedule against.