Reopen a stalled garage door quote with current model choices

A replacement quote can stall because the customer has not chosen the door. Offer a current model review after checking the original project. Keep old pricing and new supplier information distinguishable.

Steps

  1. Find the actual paused proposal Verify property and openingCheck selected model and current owner

    Open the original deal and review the proposal, customer decision and recent activity. Confirm whether the new conversation concerns that same door.

    The shared Pipedrive screenshot shows pipeline context. Use your actual record to identify unresolved style choices and avoid duplicate replacement opportunities.

    Pipedrive demo deal cards with the pipeline selector expanded
    Pipedrive’s sample deal board shows the pipeline selector. Open the pipeline that contains the original proposal. Source
  2. Offer a useful current-options page Show models your company suppliesAsk what changed in the customer's plans

    Link eligible contacts to the current options relevant to the old scope. Ask about timing and preferences without assuming the previous choice remains available.

    Follow email eligibility and suppression rules. Keep sender details, postal address and opt-out handling in commercial messages.

  3. Review selection and availability professionally Check supplier information after a replyDetermine whether a new measure is needed

    Give the estimator the customer's response and original quote. Have qualified staff review changed scope or opening conditions.

    Verify current model, configuration and supply before proposing a date or revised price. Preserve the reason for each change.

  4. Track the renewed decision to completion Keep one next activityRecord accepted model and actual installation

    Obtain acceptance of current scope and terms through the normal process. Stop duplicate reminders when the customer decides.

    Measure replies, completed reviews, revised proposals and installations. Record stock and undecided-style delays separately.

What to measure

The follow-up should resolve the customer's actual choice. Keep the estimator's current model and scope assumptions visible through ordering and installation.

PipelineOn

Enter your work email to get started

Already have an account? Sign in