Book the right inspection when a deck customer wants to keep the frame

A homeowner can ask for new boards while the old frame is still the biggest question on the job. Give your office a way to flag that question before an estimator puts resurfacing in the quote.

Steps

  1. Explain what your resurfacing estimate covers Show a permitted resurfacing projectList the work an inspection can change

    Use a photo from a job where the team documented which parts stayed in place. Describe what the first visit checks, including which elements the crew can actually see.

    Say how your company handles a frame that needs further review. Keep that estimate path separate from a new-deck design consultation.

  2. Ask for the minimum useful site information Collect the service address and approximate heightMake photos optional

    Ask what the owner wants to retain and whether the deck has stairs, a covered area or restricted access. Ask for a ground-level photo if the homeowner can take one safely.

    Carry a neutral resurfacing-page label into the request. Tally’s hidden fields can carry that label. Test the route on a phone and confirm the office sees the label and any photo.

    Tally help page explaining hidden fields and URL parameters
    Tally’s public documentation shows how to carry a campaign label into a submitted form. Source
  3. Assign a real inspector Confirm access with the ownerFlag reported movement or damage

    Put uncertainty about framing on the field checklist. The office can acknowledge what the customer reports and ask the qualified person to decide next steps.

    If PipelineOn shows a relevant return by an eligible matched household, compare it with the existing estimate first. Use the page view to prepare your question about the original request.

  4. Count viable quote scopes Record inspection attendedRecord which scope the crew can price

    Use separate outcomes for pricing resurfacing, pricing replacement, or awaiting specialist review.

    Track which questions helped the field team identify the right appointment. Keep the form short enough for people who do not know their deck’s age.

What to measure

Review how many attended inspections produced a supported quote and how often the office assigned the wrong visit type.

PipelineOn

Enter your work email to get started

Already have an account? Sign in