Set bathroom campaign capacity around fixture delivery and trade slots

A tub-to-shower offer can book well while a specific enclosure takes longer than your crew expected. Use the actual delivery and trade schedule to decide how much the campaign can promise this month.

Steps

  1. Put the fixture decision on the estimate List the approved items by scopeCheck lead times with the supplier

    Ask the purchaser to confirm availability for the items in the campaign’s featured option. Record when the supplier last confirmed those dates.

    Mark options that need design review or have a different order lead time. Forecast capacity separately for those requests.

  2. Check the handoffs before opening appointments Verify plumbing and finishing availabilityIdentify the first stage with limited capacity

    Have the production manager map who owns each stage and name the current constraint. Decide how much new design work you can take given realistic production windows.

    Keep consultations and work starts on separate calendars. Have the office confirm what the available appointment actually books.

    HighLevel internal calendar showing day and time slots
    HighLevel’s internal calendar view. After a test booking, check that the appointment appears in the correct calendar. Source
  3. Update the offer customers land on State the planning appointment clearlySet an owner for updating availability

    Revise the ad, landing page and forms with the same scope and timeframe. If a finish has limited availability, show workable next steps rather than publishing stale promises.

    Check available PipelineOn activity on the project page if you already use it. A matched visit can guide the office’s review of an eligible lead while actual inventory determines the offer.

  4. Log which promises held Record supplier status when soldTrack work starts that moved

    For each job, note the promised timeline, confirmed fixture dates and actual installation start. Capture which constraint caused any move.

    Use the number of starts you can support and the margin on the work completed to judge future campaign spend.

What to measure

Review moved start dates and name the bottleneck before increasing consultation volume.